Home > News > Content
Lead-acid Battery Industry Development Policy Analysis
Jul 22, 2016

According to understand, views increased has eliminated behind capacity of efforts and the on technology development of support, requirements immediately eliminated opening type General lead acid battery production capacity, and Yu 2015 end of Qian eliminated not through environmental protection verification, and not meet access conditions of behind production capacity; strengthening double polar sealed battery, and Super battery, and bubble graphite battery, new lead acid battery of technology development, promotion winding type, and colloidal electrolytic quality lead acid battery technology Speeding up harmless regeneration of spent lead-acid batteries scale key technical equipment, development and application.

For enterprise environments, the opinion calls for lead-acid batteries and secondary lead enterprises to improve the lead smoke, lead dust, mist and the wastewater collection and treatment facilities, and ensure stable operation and discharge facilities; to lead online monitoring facilities step by step installation and networked with the local environmental protection Department, day-to-day monitoring of the monthly report. Strict enforcement of solid waste storage and disposal and hazardous waste manifest system, containing lead waste, sludge and other dangerous wastes should be required to entrust a qualified unit for safe disposal. The opinion states that, will be developed in the future management of recycling of spent lead-acid batteries, to further the implementation of extended producer responsibility systems.

In order to regulate individual commerce recovery of scrap lead-acid batteries, and crack down on illegal acts such as dismantling and lead smelting, presented the opinion, improve the hazardous waste operating permit system, encouraging the production of enterprises through its retail network of recycling of waste lead-acid batteries in support of production and selling company, specializes in the recovery and regeneration of enterprises lead the enterprise to build a network. Strengthening of waste lead-acid batteries collection, storage, transportation, regulation of the whole process. Support scale, standardization of lead recycling demonstration project.